biomed department
 

 

San Francisco, California

The project involved not only the design of a new Angioplasty Suite in an existing hospital but also required the displaced functions to be relocated. Low floor to floor clearance combined with existing infrastructure became a primary design challenge. Close coordination between the manufacturer's representative, the electrical engineer, and the structural engineer resulted in finding a location for the equipment and meeting specified requirements for operation. The project required State of California OSHPD approval.

The suite was complete March 2003.